Our Completed Projects:

SL Description Operator Completed

1

BTS Swap from Erricsson/Motorolla/NSN BTS to Huawei BTS. GP, Banglalink,Airtel,Teletalk 2000 Sites.

2

MW Swap from NEC to Huawei GP 60 Sites.

3

BTS Installation, Commissioning & PAT All most all operator in Bangladesh like Banglalink,Robi,GP,Airtel,Teletalk etc. 3000 sites.

4

BSC (new & expansion) Installlation, commissioning & PAT (50% HW & SW Both) OTB,Robi, Teletalk, Rankstel etc. 62 Sites

5

MW Installation, commissioning & PAT Banglalink, Robi, GP, Teletalk, etc. 1500 Sites

6

HLR HW Installation Robi, Citycell, Rankstel etc. 52 Sites

7

PSTN Switch installation People’s Tel 27 Sites

8

LOS Survey Citycell 200 Sites

9

Optical Equipment Installation, commissioning & PAT Banglalink, Teletalk, Citycell, One tel etc 200 Sites
10 Field Maintainanace works in Narayongonj, Munsigonj in 2007 under Alendik of BL Banglalink About 1000 Sites
11 Field Maintainanace of BTS of Airtel in Comilla, Chittagong and Sylhet region undfer Huawei in 2010-2011. Airtel Entire BTS of Comilla,Chittagong & Sylhet region.
12 Maintainance of PAT to FAC of GP Swap project under Huawei in 2011. GP 3128 Sites all over the Bangladesh
13

13

E2E solution (BTS, MW, BSC, CN, Optics etc.) of Thimpu, Bhutan Network underHuawei. Tashi Cell 60 Sites in Thimpu,Bhutan.